Live on 1,400+ active job sites

Your Jobs. One Screen.
Zero Surprises.

Pipeline replaces the foreman's clipboard, the estimator's spreadsheet, and the project manager's whiteboard — every bid, change order, and punch list in real time.

Pipeline — Meridian Mixed-Use Phase II
3 RFIs Pending12 Active Tasks

Meridian Mixed-Use Phase II

Denver, CO · GC: Hartwell Construction · Est. Completion: Aug 2026

On Track
Budget Burn$4.84M / $7.8M
62% burned · 38% remaining↑ 4% vs forecast
12
Active Tasks
47
Completed
2
Blocked
RFI #14 — Structural beam spec revised by Apex Engineering9m ago
Change Order #7 approved — $28,400 added to contract1h ago
📋Concrete pour inspection scheduled — Bay 3, Level 43h ago
Jobs Tracked84,200+
·
Change Orders Processed$2.1B+
·
Bids Submitted312,000+
·
Hours Saved / Month140,000+
·
Uptime SLA99.98%
·
GC Teams Active4,800+
·
RFIs Resolved620,000+
·
Avg. Payout Delay Cut31 days
·
01 — Bid Management

Takeoffs that survive
Thursday's drawing revision.

Every line item tied to the current drawing set. When the architect drops Rev 4 at 5 PM, Pipeline flags every affected quantity automatically — no weekend rebuilds.

  • CSI-structured line items with auto quantity linking
  • Sub quote comparison with gap analysis
  • Revision tracking — see exactly what changed and why
  • One-click export to AIA G702/G703 format
0+bids submitted through Pipeline
Meridian Ph.II — Bid Estimate v7
Rev 4 ChangesUpdated 2h ago
CSIDescriptionQtyUnit $Total
03300Cast-in-Place Concrete — Foundations480 CY$142.00$68,160locked
05120Structural Steel Framing — Levels 1–4220 TON$3,850.00$847,000locked
07210Building Insulation — Exterior Walls14,200 SF$2.85$40,470review
08110Steel Doors & Frames — Interior64 EA$680.00$43,520locked
09260Gypsum Board Assemblies38,400 SF$4.20$161,280review
23070HVAC Mechanical Insulation1 LS$92,000.00$92,000pending
Grand Total$1,252,430
02 — Job Scheduling
Meridian Ph.II — Master Schedule↑ 3 days ahead of baseline
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Today
Site Prep & Excavation
Foundation Concrete
Structural Steel — L1–L4
MEP Rough-In
Exterior Envelope
Interior Finishes
Final Inspections
Complete
In Progress
Critical
Planned

Schedules your subs
actually look at.

Gantt views that update when the job changes — not when someone remembers to update the spreadsheet. Push notifications when predecessor tasks slip, before your crew shows up to wait.

  • Critical-path highlighting with automatic float recalculation
  • Sub notification when their start date shifts
  • Weather-adjusted schedule buffers by trade
  • Baseline vs. actual comparison at a glance
0+hours saved per month across active teams
03 — Change Orders
04 — Financials

Every change order,
documented before it's disputed.

Pipeline captures scope changes the moment they happen — with the drawing revision, the email thread, and the dollar impact attached. No more "we talked about this on-site."

$0in change orders processed
Change Order #14 — Scope Comparison
Pending Approval
Section 03300 — Cast-in-Place Concrete
Footing depth: 4'–0" per structural drawings S-101 Rev 2
+ Footing depth: 5'–6" per structural drawings S-101 Rev 4
 
Impact: Additional 180 CY concrete + 2 weeks schedule
+Change Order #14 — $47,200 | Owner approval required
Margin Waterfall — Meridian Ph.II15.2% projected margin
Contract
CO Total
Materials
Labor
Subcontract
Overhead
Margin
Financial Snapshot
Contract Value
$7.8M+$940K COs
Billed to Date
$4.84M62% complete
Retainage Held
$484K10% standard
Projected Margin
$1.19M↑ vs 12% baseline
99.98% Uptime · SOC 2 Type II Certified

Trusted by general contractors across 38 states

Hartwell Construction
Meridian Build Group
Apex Structural
Summit GC Partners
Ironclad Mechanical
BlueSky Electrical
Pacific Formwork Co.
"
Pipeline caught $184,000 in change orders we would have eaten on the Riverside Commons project. The change order tracking alone paid for three years of subscription in four months.
DM
Derek Mulcahy
President, Summit GC Partners · Phoenix, AZ
No credit card. No sales call. Just your first job.

Stop managing jobs
from twelve different tabs.

Set up your first project in under 10 minutes. Import your existing bid, invite your subs, and let Pipeline handle the paper trail.

No credit card required Free for first project SOC 2 certified Cancel anytime
Start Your First Job Free →