Your Jobs. One Screen.
Zero Surprises.
Pipeline replaces the foreman's clipboard, the estimator's spreadsheet, and the project manager's whiteboard — every bid, change order, and punch list in real time.
Meridian Mixed-Use Phase II
Denver, CO · GC: Hartwell Construction · Est. Completion: Aug 2026
Takeoffs that survive
Thursday's drawing revision.
Every line item tied to the current drawing set. When the architect drops Rev 4 at 5 PM, Pipeline flags every affected quantity automatically — no weekend rebuilds.
- ✓CSI-structured line items with auto quantity linking
- ✓Sub quote comparison with gap analysis
- ✓Revision tracking — see exactly what changed and why
- ✓One-click export to AIA G702/G703 format
| CSI | Description | Qty | Unit $ | Total | |
|---|---|---|---|---|---|
| 03300 | Cast-in-Place Concrete — Foundations | 480 CY | $142.00 | $68,160 | locked |
| 05120 | Structural Steel Framing — Levels 1–4 | 220 TON | $3,850.00 | $847,000 | locked |
| 07210 | Building Insulation — Exterior Walls | 14,200 SF | $2.85 | $40,470 | review |
| 08110 | Steel Doors & Frames — Interior | 64 EA | $680.00 | $43,520 | locked |
| 09260 | Gypsum Board Assemblies | 38,400 SF | $4.20 | $161,280 | review |
| 23070 | HVAC Mechanical Insulation | 1 LS | $92,000.00 | $92,000 | pending |
| Grand Total | $1,252,430 | ||||
Schedules your subs
actually look at.
Gantt views that update when the job changes — not when someone remembers to update the spreadsheet. Push notifications when predecessor tasks slip, before your crew shows up to wait.
- ✓Critical-path highlighting with automatic float recalculation
- ✓Sub notification when their start date shifts
- ✓Weather-adjusted schedule buffers by trade
- ✓Baseline vs. actual comparison at a glance
Every change order,
documented before it's disputed.
Pipeline captures scope changes the moment they happen — with the drawing revision, the email thread, and the dollar impact attached. No more "we talked about this on-site."
Trusted by general contractors across 38 states
Pipeline caught $184,000 in change orders we would have eaten on the Riverside Commons project. The change order tracking alone paid for three years of subscription in four months.
Stop managing jobs
from twelve different tabs.
Set up your first project in under 10 minutes. Import your existing bid, invite your subs, and let Pipeline handle the paper trail.